What should fill Clissold Park's empty paddling pool? Last call is Sunday
The Clissold Park User Group survey on the old pool site and its next fundraising project closes on 29 November, as Hackney finalises a new playground.
By Beth Betton · · 2 min read

The paddling pool in Clissold Park was built in the 1930s and is, in the user group's words, "beyond repair". It has been replaced by the Splash Pad. What to do with the hole it left is a question the borough has failed to answer for five years.
More than 1,100 people took part in a council consultation on the site in 2021. According to the Clissold Park User Group (CPUG), "no clear consensus emerged". There are no confirmed plans. Hackney intends to consult again, but only after the playground improvements and the depot works are finished.
CPUG has decided not to wait. Its survey asks two things: what park users would like to see on the former pool site, and what the group should raise money for next. It closes on Sunday 29 November. The group, which has records going back to at least 1989, is careful to point out that a new pool would need more than a building fund. Staffing, cleaning, inspections and repairs cost money every year, and the old pool was undone by exactly those things.
The playground is further along. Hackney's consultation on the redesign closed on 6 November, after drop-in sessions at the playground on 3 and 30 October. Earlier conversations with children and families produced a clear list: more swings and climbing, keep the large slides and the zipline, more play for different ages and abilities, less sand, more planting and seating. The proposed design includes natural play materials, climbing structures and areas for younger children. The council has not yet announced the next steps.
The group's record of getting things done is better than the council's on the pool. A quiz and auction in September 2025 raised £1,280 towards a public-access defibrillator, which was installed on the Splash Pad building in July after a first site at the tennis pavilion turned out to be unsuitable. Volunteers cleared litter from the bed of the ornamental New River when the water was low, and planted water lilies donated by Paul Brenells. The council has a quote for repairs to the sluice. There is no date for the work.
The survey is linked from the CPUG website, clissoldpark.com. It takes a few minutes, which is less time than the pool has been empty.